Groundwater Management Plan
General
The City completed the Gloria Way Water Well Production Alternatives Analysis and Water Security Feasibility Study in November 2012, which recommended that the City to: (i) move forward with design of a manganese removal treatment system for the existing Gloria Way Well; (ii) further evaluate and test for additional potential well sites; and (iii) develop a groundwater management and monitoring plan.
The City intends to reactivate Gloria Way Well upon construction of a well head treatment facility to address removal of manganese, a secondary drinking water contaminant. As part of the reactivation process, State law requires the City to adopt a Groundwater Management Plan. The development of the Groundwater Management Plan is a collaborative and open process. A copy of the Stakeholder Outreach Plan can be found in the link below: